The Davis Project: Status - August 1, 2008
This is an approved Bayside Project!

Thanks to the work of Phil Vanderloo (c:612-1704, vanderloo5@comcast.net )

The Davis Project looks promising.  See the Web page at http://www.davisproject.org/ .  The site is located at:

1425 Nogales Street, Sacramento, Ca 95838-4516

 
Phil is a building contractor and runs Hiline Builders Inc. ( hilinebuilders.com )

 

Phil found out about the Davis Family's plight in the Bee. 

( http://www.sacbee.com/101/story/909902.html ) and decided that he wanted to make a difference.  Phil will be sharing the leadership responsibilities with James Bufford, another experienced contractor who has worked on many projects with Rebuilding Together volunteers. James represents State of BEing, a not-for-profit organization, doing great things for the disadvantaged in the city.

  
We believe that the experience, oversight capabilities, insurance umbrella and the vast array of suppliers, contractors and volunteers that Rebuilding Together has will greatly impact the success of this project. The project is expected to take up to 6 months to complete.

Bayside is now the main sponsor of this project and is encouraging skilled and unskilled volunteers to get involved.

We had our first workday on Saturday, July 26.  The bee covered the event:

( http://www.sacbee.com/antelope/story/1112168.html#comments_here  )

Click Here if you would like to be contacted about Donating Materials per the list below:

      Material Donations <----  CLICK IT to Donate!

Click Here if you would like to volunteer (Note- this will take you to the Rebuilding Together Volunteer Page.

Please fill out all of the Volunteer information so we can assign you to the proper team, date & time.)

When it asks for project, select "DAVIS PROJECT",

To the question: "I prefer to work with the following group or person", enter "Bayside"

               Volunteer  <---- CLICK IT to Volunteer!


Contact Dave Coburn if you have questions about this project. 

office:  (916) 791-1244 x8514

cell:     (916) 337-7733

email: coburn180@comcast.net



Services and Material Required

Stucco approximately 2000 square feet of wall coverage; Stucco to be 3 coat system with sand finish.
Rough plumbing copper piping or pex piping for water service. ABS waste pipe for kitchen, laundry and 3 baths, gas for cooktop and water heater. ABS vent piping as needed through roof with roof jacks installed prior to roofing.
Rough electrical wiring as needed per plan for all electrical service outlets, phone, and cable tv. Installation of all recessed ceiling cans prior to frame inspection, insulation and sheetrock installation. Also includes provision and installation of new 200 amp service panel. (Some rough electrical has been completed).
Facia Remove and replace all existing fascia and barge rafters with new 2x6 resawn spruce or equal.
Roofing roof to be 22 squares of 40 year dimensional composition shingles with galvanized sheet metal valley flashing and continuous ridge vent.
Insulation Provision and installation of insulation as needed to meet all Title 24 energy compliance codes and standards. Insulation to be R-15 in all exterior walls and R-38 in ceilings.
sheetrock Provision and installation of sheetrock and tape & texture. Finish to be medium knockdown texture.
Provision of cabinets 21 lin. feet of lowers and 21 lin. feet of uppers, (kitchen), 6 lin. feet lowers and 6 lin. feet of uppers, (laundry), 2 bathroom vanity cabinets and 1 slip in linen. Wood species and style to be determined.
Provision and installation of all appliances to include; 1- gas cooktop, 1- oven micro combo, 1- badger or insinkerator garbage disposal, 1- dishwasher, 1- 40 gallon gas water heater.
Provision and installation of all plumbing fixtures to include; 1- kitchen double sink and faucet, 1- bathroom shower stall- approx. 4’ x 4’ with shower valve and head, shower wall material to be determined, 1- bathroom lav sink with faucet, and 1- water closet, (master bath), 1- pedestal sink with faucet, 1- tub/shower combo with shower valve and head, 1- water closet, (bath 2), and 1 vanity lav with faucet, 1- tub/shower combo, 1- water closet, (bath 3) possibly 1- fiberglass laundry sink and faucet.
Provision and installation of doors, door hardware, casings, and baseboard.  Doors to include 1- 3/0 x 6/8,( entry), 1- 3/0 x 6/8, ( exit at laundry). Interior doors to include; 1- 2/4 (bath 1), 1-2/4, (bath2), 1- 2/6 , (master bedroom), 1- 2/6, (master closet), 1- 2/6, (bedroom 2), 1-2/6, (bedroom 2 closet), 1- 2/6, (bedroom3), 1-2/6, (bedroom 3 closet), 1-2/8, (laundry). Doors, Baseboard , and casing style to be determined. (Some doors and door hardware have been donated.)
Provision and installation of electrical fixtures per plan to include; 6 ceiling mount lights, 3 vanity lights, 3 exterior wall mt. lights, xx ceiling fan lights, and 12 recessed can lights and trim.
Provision and installation of all bath hardware and mirrors. Provision and installation of all bath hardware and mirrors.
Provision of all concrete needed for flatwork, (approx. 20 cubic yards) Provision of all concrete needed for flatwork, (approx. 20 cubic yards)
Additional carpentry help Additional carpentry help will be needed for various repairs.
Trash bins for refuse. Trash bins for refuse.
Sanitation facilities. Sanitation facilities.
Final detailing and cleanup. Final detailing and cleanup.
3 glass shower doors. 3 glass shower doors.
trash compactor trash compactor
landscaping and landscape irrigation. landscaping and landscape irrigation.
All floor covering and installation labor. All floor coverings and installation labor have been donated.
All counter tops, install labor and materials. All counter tops, install labor and materials have been donated .
All paint material and labor interior and exterior. All paint material and labor interior and exterior have been donated.
Some doors and door hardware. Some doors and door hardware have been donated.
Lumber required
Wayside lumber has committed to some or most of the lumber required although, after further assessment, more material may be required..
   
 